Chat with us, powered by LiveChat PROCESS PKG FOR GAS (LNG PARTIAL RE-LIQUEFACTION SYSTEM) | 선보유니텍(주) - 코마린
선보유니텍(주)
기업 소개 전화하기
PROCESS PKG FOR GAS (LNG PARTIAL RE-LIQUEFACTION SYSTEM)
모델
-
시리즈
GREEN
제품 소개

LNG PARTIAL RE-LIQUEFACTION SYSTEM


- Project : Test Pilot Project of DSME
- Site : Republic of Korea
- Shipyard : DSME
- Engineering : DSME and SUNBO
- End-user : DSME
- Delivery : Apr. 2014
- Size : 2.7m(H) x 3.5m(L) x 4.3m(W)
- Weight : 5.5 Ton
- Scope of Work : Shop/Field Fabrication Drawings
                                 Procurement of bulk materials
                                 Fabrication of piping, stru. And rack assembly
                                 Final Vendor Documents
                                 Cryogenic Test using LN2

- Main Material : Structure - CS
                              Piping - CS, SS316