English | 선택 | |
한국어 | 선택 | |
Русский | 선택 |
해승케이피피(주)
SMP Characteristics
모델
-
시리즈
ENGINEERING
제품 소개
SMP is placed at mooring site to fit AFT side of the SMP just above the AFT side anchors’ position.
At step 1, The AFT mooring lines are connected to the SMP AFT at the sea surface and the
SMP is lowered to position 2. At step 2, the SMP is placed at position 3
to have the room length of FWD mooring lines and connection at FWD side. At step 3,
the SMP is floated to reach the destined position 4. Finally, the SMP is awaiting
the FPSO to be moored above.
생산 제품
ENGINEERING
PIPE SPOOL(Fabrication)
PRESSURE VESSEL(Fabrication)
HEAT EXCHANGER(Fabrication)
STEEL STRUCTURE(Fabrication)
PIPE SPOOL(MAJOR EXPERIENCES)
ONSHORE
OFFSHORE - DRILL SHIP
OFFSHORE - TLP and FPU
OFFSHORE - FLNG
OFFSHORE - FPSO
OFFSHORE - SEMI RIG / JACKUP RIG
OTHER PRODUCTS(MAJOR EXPERIENCES)