Chat with us, powered by LiveChat Philip Morris International | 보성 - 코마린
보성
기업 소개 전화하기
Philip Morris International
모델
-
시리즈
Engineering
제품 소개

Client

Philip Morris

Project

Reduced Risk Product

Period

July. 2017 ~ Sept. 2019


Work Scope

- Uninstallation of old manufacturing/assembly line
- Reconditioning of Factory
- Installation of new manufacturing/assembly line