English | 선택 | |
한국어 | 선택 | |
Русский | 선택 |
보성
Mariner Project
모델
-
시리즈
Engineering
제품 소개
Client Dockwise | Project Grillage and Sea-Fastening Installation | Period Jan. 2017 ~ Apr. 2017 |
Work Scope
- Installation of grillage and sea fastening
- NDE & paint
- Provision of dockyard, utilities,lifting machineries
생산 제품
Engineering
Epcic Works
Engineering (Oil Flushing)
Oil Filtering Unit
K-7, K-4, K-6, K-8300T
Oil Flushing Unit
Oil Tank
Oil Centrifuge Unit
Other equipment
Engineering (Acid Cleainng)
Commissioning (Generator)
Load Bank
Diesel Transfer Pump Skid
Diesel Transfer Pump (With filtering system)
Transformer
Diesel Generator
Diesel Oil Tank
Fuel Storage Tank
Transformer Container
Commissioning (Compressor Systems)
Air Dryer (Desiccant Type)
Air Compressor Package (Engine Driven)
Air Tank
Air Compressor Package 100HP (Motor Driven)
Air Compressor Package 200HP (Motor Driven)
Air Dryer System Container
Commissioning (Pump Systems)
Commissioning (Suppotting Systems)