SUNBO Industries
PIPE RACK (MRT)
Model
-
Series
ON/OFFSHORE (HEAVY STRUCTURE MODULE)
Product Description
Project : SHELL FLNG ProjectSite : W.AUSTRALIA
Shipyard : Samsung Heavy Industries
Engineering : Samsung Heavy Industries
End-user : SHELL
Delivery : Dec. 2013
Size : 23~27M X 8.4M X 8M X 12sets
Weight : Total 1,600 Ton(12 Sets)
Scope : Shop/Field Fabrication Drawings
Procurement of bulk materials
Fabrication of piping, stru and RACK assembly
Final Vendor Documents
Main Material : S420
Piping : SS316L, Alloy, CS, and Cu-ni
Product List
ON/OFFSHORE (HEAVY STRUCTURE MODULE)
GREEN
PROCESS PKG FOR GAS (LPG Compressor Skid)
BWMS
PROCESS PKG FOR GAS (LNG COMPRESSOR PACKAGE)
PROCESS PKG FOR GAS (LNG PARTIAL RE-LIQUEFACTION SYSTEM)
PROCESS PKG FOR GAS (LNG COMPRESSOR PACKAGE)
PROCESS PKG FOR GAS (LNG FUEL GAS SUPPLY SYSTEM)
SHIPBUILDING (ENGINE ROOM PACKAGE)
SHIPBUILDING (GROUP UNIT)
SHIPBUILDING (EQUIPMENT)
ON/OFFSHORE (PROCESS PKG)
DEOXYGENATION PACKAGE
PURIFIER SKID
MEG REGENERATION SKID
GAS SWEETING SKID
FUEL GAS SKID
SRU/UF PACKAGE
CALORIFIER PACKAGE
ACTIVATED CARBON POLISHING UNIT, MIXED BEDS EXCHANGER POLISHER PACKAGE
PRODUCED WATER TREATMENT PACKAGE
ELECTROCHLORINATION PACKAGE
ON/OFFSHORE (UTILTY PACKAGE)
VACUUM SKID PACKAGES
FUEL OIL COALESCING FILTER SKID
H.F.O TREATMENT UNIT
VACUUM SKID PACKAGES
DIESEL CENTRIFUGE PURIFIER
FUEL OIL DUPLEX BASKET STRAINER SKID
DO PURIFIER
DIESEL CENTRIFUGE PURIFIER
FUEL GAS SUPPLY SYSTEM
BOG COMPRESSOR SYSTEM
RELIQUEFACTION SYSTEM