English | Select | |
한국어 | Select | |
Русский | Select |
Total Solution
Description | Shop | On-Site (On-board) |
1. Hydraulic Power Unit | • Design • Fabrication • Inspection & Test • Commissioning |
• Installation • Inspection & Test • Commissioning |
2. Flushing Unit | ||
3. Control Console of Pilot | ||
4. Hydraulic Piping Applications – Pressure Line – Return Line – Pilot Line – All systems |
• Material (Purchase) • Fabrication • Hydro Test & Flushing • Particle Counters |
• Material Management • Installation • Hydro Test & Flushing • Particle Counters(LasPaCⅡ) • Commissioning • Flushing Unit Rental |
5. Hydraulic Components | • High Pressure Valves • High Pressure Hose • Ball Valve • Clamp • Bulkhead Adapter • Connection Fittings |
• Material Management • Installation • Hydro Test • Inspection • Commissioning |
Why STAUFF Korea?
- Urgent supply of material - Possession/purchase of DN material
- Operation of installation team at domestic and abroad - Process / product malfunction management
- Special boat performance such as FRAMO - Problem handling ability
- Rationality of geographic location - Located at middle of Ulsan and Geoje
- Ability to cope with urgent requirement s- Strategic Collaboration & Network Systems
- One Item, One Customer - Proper Load, On-time delivery
- History management - Separate Series / Line / Pc's Management
- Worldwide Network - Direct/Indirect customer support