English | Select | |
한국어 | Select | |
Русский | Select |
The outline of equipment
- This is a welding equipment for longi. Stiffener and trans girder. Each telescopic boom equipped with welding head or multi axes robot can vertical welding, pail pack and power source are located on the upper of boom. Each head have CCD Camera by checking ARC and it is watching by control panel.
Welding Process
- Welding Process : FCAW 1Pole x 4Head = 4Poles
- 전극 구성 : 1Poles
- 용접 자세 : 1F
- 적용 Wire : φ1.2, φ1.4, φ1.6mm
- Welding Speed : 100mm ~ 1500mm/min
- M.P.S (Memory Playback System) 장착
Construction of equipment
- Travelling Speed : Max. 30/Min
- Tack Welding Carriage :
Return Speed : 10M/Min
Welding Speed : 100~1,500mm/Min
- Welding Power Source : D.C 600A x 4Sets
- Seam Tracking : Arc Sensor